Kazakhstan / Astana, Klinic of the Presidential Administration

The whole supply of the project from the heating oil provisioning to the domestic building as well as from the domestic building to the main building, has been executed redundantly.
This implies that all units and supply lines are doubly present. So in case of damage (breakdown of a boiler or a feeding pump, damage or breakage of a pipe, etc.) the supply of thermal heat, steam, refrigeration, potable water, extinguishing water, air and electricity is provided.

Bild 1 Bild 2 Bild 3

China / Schanghai, EXPO2010 Pavilion-Germany

Although it is only a temporary building, great importance has been attached to a comfortable climate for the visitors and a technical and optical flawless execution of work in the planning and supervision of construction stages.
Our area of responsibility includes the calculation of costs during the planning stage, the development of alternative solutions in the building services sector, the supervision of building services and electrical engineering (air conditioning systems, refrigeration plants, sanitary systems, sprinkler systems, electrical equipment) during the construction period.

Bild 1 Bild 2 Bild 3

United Arab Emirates / Abu Dhabi, Visitor Center

Special emphasis has been put on the planning of the air conditioning for the exhibition. Here the indoor environment has to be optimal to protect the eventually very precious exhibits from climate related influences despite of the extreme outside climatic conditions. Aside the extreme climatic conditions that had to be considered for the planning of the air conditioning system, attention had to be paid to the local standards such as the separation of potable and non potable water, the sewage disposal of wastewater and grey water.